Construction period
08/2023 - 09/2025
Project size
9,160 m² / 40,000 m³
B&B Hotels Diegem
STRABAG Belgium was commissioned to construct a hotel featuring both underground and above-ground parking, complemented by environmentally conscious landscaping.
The private turnkey contract comprised structural works, finishing, coordination of technical installations and landscaping.
Because the works had to start on an existing foundation slab, the preparation phase differed from a standard project, and the building was completed in several stages: the structural phase, the construction of several model rooms and, finally, the finishing phase.
As part of an innovative technical approach, prefabricated service ducts were chosen. This solution significantly accelerated the construction process and improved on-site efficiency.
One of the greatest challenges of this project was the limited space available on site. To address this, the 5S principle — sort, set in order, shine, standardise, sustain — was applied, a method focused on order, cleanliness and efficiency in the workplace. In practice, the 5S circulation zones were clearly marked on the site layout plan and visually highlighted on-site with red carpet strips. This ensured a safe and well-organised working environment despite the restricted space.