Client
Sabca Limburg nv
Location
Lummen
Architects
STRABAG Belgium Central Services in collab with Mint Architects
Engineering consultancies
Creteq in collab withTractebel Engineering
Construction period
08/2024 - 04/2025
Project size
1,200 m ² / 40,000 m³
Sabca Cleanroom
STRABAG Belgium completed the construction of a clean room within the Ariane hall at Sabca Limburg, including the installation of machine foundations.
STRABAG Belgium was commissioned by Sabca Limburg NV to carry out a Design & Build project for the transformation of the existing Ariane hall into a clean room. We were are responsible for the construction of the machine foundations.